Project Owner:
AT&T Telecommunications Facility Upgrade- Greer, SC
General Description:
Critical Facilities contract involving a switchboard replacement and removal of existing equipment. Contract included the construction of mechanical pads and coring into existing floors and walls to re-route required conduits. Outdoor water infiltration was also repaired with the installation of a membrane waterproofing system.
Client: AT&T
Location: Greer, SC