Project Owner:
Duke Energy Corporation (Toddville Operations Center, Charlotte, NC)

General Description:
Improvements to the existing storm drainage system that includes demolition and installation of 1,120 LF of storm drain piping and 15 concrete structures. Additionally, provide and install a 30,000 gallon underground steel interceptor tank and a 60,000 gallon underground steel oil/water separator with integrated alarm system. Project included 1,000+ cubic yards of rock removal by drilling and blasting. Sitework improvements include stone paving, concrete drainage flume, and a 50′ x 15′ concrete slab.

 

Client: Duke Energy Corporation

Location: Charlotte, NC